New Kitchen Construction

It took 10 months of preparation to get started and another 3 months of actual work, but the end result is a stunning rebuild of the existing space!


Control Panel
View a slide show of these photos
The boxes collect as the prep work continues Finally the work begins! The work and boxes pile up... The work and boxes pile up... The work and boxes pile up... The work and boxes pile up... Jenny hids amongst the boxes The work and boxes pile up... The work and boxes pile up... Tearing down the old kitchen Tearing down the old kitchen Tearing down the old kitchen Tearing down the old kitchen Tearing down the old kitchen Tearing down the old kitchen Installing the cabinets requires some wall work The walls are stronger with the plywood installed The walls are stronger with the plywood installed The walls are stronger with the plywood installed The walls are stronger with the plywood installed The walls are stronger with the plywood installed As the walls come together, they are strengthened The construction continues The construction continues The flooring installation begins Here comes the tile! The flooring is almost done The last bit of flooring The lighting will need a change YeahÉ. We're going to need new lights
©2010 

Valid XHTML 1.0 Transitional